The Maojianshan Hydropower Station and the Ningguo Hydropower Station are the leading power stations in Anhui's Qinshui River Basin and Xijin River Basin respectively. The total installed capacity of the two power stations is 50,000 kilowatts, of which the installed capacity of the Maojianshan Hydropower Station is 30,000 kilowatts. The transfer and acceptance of this power station make Anhui Province The company can take full advantage of the expertise of the hydropower station and continue to open up the Anhui hydropower market.
600Mbps Wireless-wifi Repeater
About this item
1. Ideal for boosting existing network to hard-to reach area, delivering fast and stable wireless connection, transfer rate up to 600Mbps
2. Repeater/AP modes for extending wifi or create wifi hotspot, watch video on line, play games, online shopping without interference
3. Activate passion for your life, mobile devices at full signal, wall mounted design flexible to place and 7 steps to finish setup
4. Designed with mobility and portability, little gadget with great value, One-touch wireless security encryption with WPS button
5. Ethernet port allows the Extender to function as a wireless adapter to connect wired devices, Compatible with 802.11n/g/b devices
2 Working Modes:(Select
based on your needs)
Repeater Mode
Plug WiFi Booster into your power
socket, easily expand your existing WiFi coverage to signal dead zones
Access Point Mode
Connect your router signal with
Ethernet Cable, cover a wired network to a wireless access point.
600Mbps Wireless-Wifi Repeater,Wifi Amplifier,Wireless Extender,Wifi Booster For Home
Shenzhen Jinziming Electronic Technology Co.,LTD , https://www.powerchargerusb.com