First, the machine room
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
On stone KTV Ray equipment installation specifications, but also for the same reason other KTV installation. A, room
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
On stone KTV Ray equipment installation specifications, but also for the same reason other KTV installation. A, room
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
Above is the installation specification of Lei Shi KTV equipment, the same reason is also suitable for other KTV equipment installation.
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
On stone KTV Ray equipment installation specifications, but also for the same reason other KTV installation. A, room
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
On stone KTV Ray equipment installation specifications, but also for the same reason other KTV installation. A, room
1. The central computer room needs large space, good ventilation, air conditioning, and the server needs to be equipped with UPS.
2. The network is dominated by a tree structure, the server is connected to the central switch, the secondary switch is connected to the central switch, and the secondary switch must use a 16-port switch.
3. A network cable from the equipment room to each private room. The length of each network cable should not exceed one hundred meters.
4. The network cable in the equipment room should leave a margin of 3-4 meters according to the position of the switch.
Second, the machine room to the private room
1, the network cable requires the original super 5 line, the brand can use AMP, Lucent and other brands. However, it should be noted that there are more fake lines on the market at present, and you should be extra careful during the procurement process. Never use fake lines! ! ! It is best to sign a quality assurance agreement with the supplier.
2. The two ends of each cable should be marked with an independent sign to avoid confusion in the future.
3, the network cable can not have a joint in the middle, can not bend the bend, can not be squeezed, can not be damaged, must wear PVC pipe to prevent the mouse from being bitten in the future.
4. When the network cable is crossed or paralleled with strong current, the network cable should be kept at a distance of about 15 cm from the strong power, and at the same time, it should be kept away from possible interference equipment.
5. After the cable of each private room or management point comes out of the corner, be sure to leave a network cable of sufficient length to avoid wiring. The principle of wiring is to leave the network cable at a right angle to the position of the set-top box according to the specific position of the set-top box, and then leave a margin of about 1 meter.
6, after the network cable to test all the lines to ensure smooth.
7. After the wiring is completed, be sure to protect the network cable during the decoration process. For example, bundle the network cable, do not step on the network cable, and do not pick up the network cable when carrying things.
Third, private room equipment
1. TV cabinets, karaoke stations, and singing stations all need power sockets, and the socket jacks should be enough.
2, the power outlet needs to be grounded, the song station, the concert station also need to be grounded! ! !
3. If you install a song station or a concert station, the various wires coming out of the ground should be larger than 1.5 meters.
4. The microphone cable and PS2 cable are required to have a shielding function.
5. When using the AV-VGA converter box, pay attention to the difference between the LCD monitor and the normal monitor.
6. Before installation, the crystal head and VGA head should be well prepared and measured.
7. Before installation, the base of the service light and wall panel needs to be installed.
Above is the installation specification of Lei Shi KTV equipment, the same reason is also suitable for other KTV equipment installation.
LED Solar Light,LED Solar Lighting,IP65 LED Solar Light