Electrician's year-end work summary essay - Solutions - Huaqiang Electronic Network

SMD aluminum electrolytic capacitor

Since I worked, I have been working in frontline electricians. For many years, I have strictly demanded myself and worked hard. Since the hot summer of this year, I came to the equipment department of Yinlong Mining Co., Ltd. to participate in the installation and commissioning of the company's electrical equipment. Time is like the sword is now at the end of 13 years, recalling the installation equipment of the colleagues at that time, the installation and wiring of the equipment in the sputum sputum workshop in the cold winter, the high flames of the people, the equipment installation of the bismuth oxide workshop Under the efforts of everyone, we can complete the quality.

During the first half of the year, each workshop's electrical equipment was involved in the work and failed to be repaired in other workshops on duty. The workload includes installation and wiring of power distribution cabinets, installation of bridges, installation and commissioning of remote control buttons, installation of automation equipment, installation of basic circuits, installation and maintenance of lighting equipment, installation of wind turbines, transformation of lines, and replacement of power cabinet relays.

Problems in the work, such as the electrical failure of the motor, then how to find and eliminate it? First of all, check whether the insulation of the lead wire is intact, whether the motor is overheated, check whether the wiring meets the requirements of the nameplate, whether the winding and the first and last ends are correct; measure the insulation resistance and DC resistance to check whether the insulation is damaged. Whether there are open circuit, short circuit and grounding in the winding;

Our company is newly established. There are not too many requirements for the place where the gas discharge equipment is installed. For example, the trench below the power cabinet has not been dig a minimum point. Due to the geographical location of Changting, the rain is more than the subtropical climate. Then the water can not flow out in time in the trench, and the acidic substance contained in the rain will have a corrosive effect on the cable, which will cause a safety accident.

As an old electrician, there may be mistakes in the work. In the case of a large workload, I think that I have to finish it quickly, but even the simplest wiring may be wrong. I remember that the temperature control button installed and debugged in the sedimentation workshop is always wrong when debugging. After careful inspection, the wiring is wrong, the circuit diagram is not accurate, and the parameter settings are not correct. So learn to look at the circuit diagram correctly, you can achieve twice the result with half the effort when installing the device. In the process of installing electrical equipment, the installation is not sloppy, then the test can be successful!

Therefore, in the practice of production, we must implement the rules and regulations on the wall, strictly in accordance with the rules and regulations, life safety first! If you don't understand it in the course of your work, ask and ask with humility. If you really don't understand it, just write it down and let everyone discuss it. In the era of knowledge renewal, new equipment comes out, so it is necessary to learn, strive for progress, and will not lag behind others!

To unite colleagues in the work, only if everyone works in a tacit understanding, then the work will be efficient. The mistakes that occur in the work are not going to happen next time. These are the directions that I will work hard in my future work.

RTX 3080 Graphic Card

1.NVIDIA Ampere Streaming Multiprocessors: The building blocks for the world`s fastest, most efficient GPU, the all-new Ampere SM brings 2X the FP32 throughput and improved power efficiency.
2.2nd Generation RT Cores: Experience 2X the throughput of 1st gen RT Cores, plus concurrent RT and shading for a whole new level of ray tracing performance.
3.3rd Generation Tensor Cores: Get up to 2X the throughput with structural sparsity and advanced AI algorithms such as DLSS. Now with support for up to 8K resolution, these cores deliver a massive boost in game performance and all-new AI capabilities.
4.OC edition: Boost Clock 1935 MHz (OC mode)/1905 MHz (Gaming mode)
5.Limited white edition for themed gaming rigs.
6.Axial-tech fan design has been tuned up with more fan blades and a reversed rotational direction for the center fan.

7.GPU Tweak II provides intuitive performance tweaking, thermal controls, and system monitoring.


About this item
1.Chipset: NVIDIA GeForce RTX 3080
2.Video Memory: 10GB GDDR6X
3.Memory Interface: 320-bit
4.Output: DisplayPort x 3 (v1.4a) / HDMI 2.1 x 1
5.Digital maximum resolution - 7680 x 4320

what is the best gpu for mining,graphic card stock,graphic card geforce,graphics card for gaming pc,graphics card amazon

Easy Electronic Technology Co.,Ltd , https://www.yxpcelectronicgroups.com

Posted on