Announcement of Open Tender for Power System Rebuilding Project of Shandong Tourism Vocational College

Announcement of Open Tender for Power System Rebuilding Project of Shandong Tourism Vocational College

(The announcement deadline for the tender notice is 5 working days)
I. Procurement project name: Shandong Power Vocational College Power System Expansion Project 2. Purchase Item No.: SDCZLD-GK-2017-0002
Third, the procurement content and subcontracting situation:
Package No. Goods Name Supplier Qualification Requirements The budget of this package (10,000 yuan)
1 Power System Reconstruction Project of Shandong Tourism Vocational College 1. Suppliers participating in registration should be registered in the territory of the People's Republic of China and have independent legal personality. 2. The bidder shall have the Qualification of “Classification (Renovation, Trial) Electric Power Facilities Permit” issued by the State Electricity Regulatory Commission for class 4 or above. Third, have the necessary equipment and professional technical capabilities to perform the contract. Provide similar projects in the past three years (2014.1.1 to date). 4. The enterprise manager has more than 5 years of experience in electric power engineering management; 5. The technical person in charge must have more than 5 years of experience in the technical management of electric power engineering construction and have a professional title above that of the professional. Do not serve other projects during the period. 6. The person in charge of finance shall have a primary or higher accounting title; 7. The enterprise shall have no less than 20 engineering and economic management personnel with professional titles. 8. Provide design drawings and propose optimization plans based on the site investigation. Nine, warranty period: Since the acceptance of qualified for 36 months. Ten, this tender does not accept the Commonwealth bid. 11. Other conditions stipulated by laws and administrative regulations. 195.000000
Fourth, obtain tender documents
1.Time: From 09:00, March 16, 2017 to 16:00, March 22, 2017 (Beijing time, except holidays)

Solar Cell

The mono-crystalline wafer production flow consists of cutting, cleaning and sorting procedures. The production capacity and wafer yield rate have been continuously improved to meet the clients` requirements on wafer quality and yield with great endeavors to constant improve our cutting technology and final inspection capacity.

Solar Cell,Photovoltaic Cell,A Grade Solar Cell,High Power Solar Cell

Wuxi Sunket New Energy Technology Co.,Ltd , https://www.sunketsolar.com

Posted on